Change one delivery date in a Word scope of work
A client moved the draft delivery by a week. Change that date in the existing DOCX, keep the review deadline intact, and check the copy you hand over.
Find the clause the client approved
Imagine a scope of work with two dates in the same numbered item. “Deliver the draft on 12 June. Client comments are due on 26 June.” The client has agreed in writing to move the draft to 19 June. Nobody has moved the comments deadline. Rewriting the whole paragraph gives the agent room to make those two dates sound consistent by changing both. There is a much easier edit to check: replace the first date where it already appears.
Open a working copy and read the heading immediately above the clause and the item below it. A scope can mention delivery dates in an executive summary, a milestone table, and the detailed terms. Decide which occurrence the agreement covers. If you spot a conflicting date elsewhere, note it for the owner before making a wider change. The Word editor overview shows the page and review controls used here.
Select the date you want to change
Select the characters “12 June” in the delivery sentence. Leave “on” and the full stop outside the selection. Follow the Word selection and review steps to check the reference in AI Edit before drafting the request. Selecting an entire list item can also capture its closing paragraph mark. If the reference starts with the previous sentence or runs into the next item, remove it and select again.
Replace the selected delivery date with “19 June”. Keep the rest of the sentence, the client comments deadline, and the paragraph formatting.
An exact replacement avoids asking the agent to interpret “move it a week” or consult other dates in the agreement. If you prefer to see the interaction before trying it, the Word editing clip shows how a selected passage is replaced in place. The clip uses the same scope and both June dates, so you can check the unchanged deadline as well.
Review the change as someone signing the document
With Ask Every Time selected for this file, review the suggested wording in the paragraph. Read both sentences aloud. The first should now promise a draft on 19 June. The second should still request comments by 26 June. Check the month as well as the number, particularly if different people on the project use different numeric date conventions. Keep the document’s established convention wherever it is unambiguous.
If the proposed wording changes “draft” to “final,” restore the original. That single word changes what the client expects to receive. Try again with a shorter selection. Accept the change once the sentence says what the parties agreed. The review walkthrough explains where accepting a candidate fits into the handoff.
Check the page break and the next numbered item
Dates rarely look like a layout problem until a long month wraps onto a second line. Read the paragraph at the size your client will use. Check that the date sits inside the same numbered clause and uses the same type and weight as the words around it. Look at the next heading and the first line of the next page. An extra line can leave a heading stranded or separate a table label from the table it introduces.
If the document contains a separate schedule, compare its milestone label with this clause before touching it. Draft delivery and final delivery can legitimately fall on different dates. Flag a suspected inconsistency with the section name and original wording so the owner can decide whether another edit belongs in this revision.
What if the same date appears in the milestone table?
A reviewer searches the document for “12 June” and finds it again on page three. Before replacing the second occurrence, read the row label. “Workshop on 12 June” records a meeting. “Draft findings due 12 June” might refer to the delivery you just moved. Treat the workshop date as a separate fact and take the findings row to the owner if the amendment only named the delivery clause. A document-wide replacement would erase that distinction in seconds.
Two occurrences of the same date can even need different wording. The prose might give the revised delivery date in full, while the table uses short dates under a shared year heading. If the owner approves both updates, edit each occurrence in its own context. Read the table across afterward, including the milestone, owner, date, and the notes at the end of the row. Otherwise a date copied into the wrong row can look perfectly reasonable on its own.
Use a simple handoff record while the draft is open:
- Changed: the date in the draft-delivery sentence under Scope.
- Checked: the client-comments sentence immediately after it.
- Needs a decision: the matching date in the milestone table on page three.
If this file will leave the team, the client proposal checklist carries that review into the summary, commercial terms, and final pages. It also gives the account owner a place to pick up the outstanding question.
Hand over a copy you can identify again
Use Save As and choose a destination you can reopen directly. A name like “Scope of work – revised draft date.docx” tells a colleague what distinguishes this copy. Close it and reopen it from that folder. Search for “Deliver the draft on 19 June” and read through the comments deadline. Searching for 19 alone may take you to a page number, price, or clause reference.
If the old sentence comes back, follow the saved-copy checklist. Record the filename and folder that actually opened. A useful handoff note is short: “Draft delivery now reads 19 June in the delivery clause. Client comments remain due on 26 June.” The recipient knows where to look and what the approved revision covers.